Praya works as rapidly as possible, and with this view I propose to lay a line of rails along the quay, between the Blocks and the coaling, on which is to travel a movable steam crane as described in the requisition forwarded to you 3rd instant for transmission to Agents. I now propose in the first place to commence with one Floating Crane for setting Blocks in the wall, but it may be found advantageous with a view of carrying on operations at a maximum speed to order a second Floating Crane or Derrick. The land crane must be obtained from England, but time and money will be saved by ordering the Steam Tug and Floating Crane of the Dock Company. The Block and Hopper Barges (14 Barges should, the latter be decided on) can be made locally either by English or Chinese contractors.

As regards the Floating Crane and steam Tug, I cannot too strongly urge that I may be authorised to enter into a contract with the Dock company without further delay, as recommended in my letter of 25th ultimus. I am deeply impressed with the importance of pressing on the Works. The importance of delay of a single month means a loss to the Government and the Lotholders combined of $50,000 (assuming my former calculations which are based on official estimates to be correct), an amount considerably exceeding the total cost of the Tug and Crane. In my report of 9th January...

Edit History

2026-05-26 08:54:10 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
Praya works as rapidly as possible, and with this view I propose to lay a line of rails along the quay, between the Blocks and the coaling, on which is to travel a movable steam crane as described in the requisition forwarded to you 3rd instant for transmission to Agents. I now propose in the first place to commence with one Floating Crane for setting Blocks in the wall, but it may be found advantageous with a view of carrying on operations at a maximum speed to order a second Floating Crane or Derrick. The land crane must be obtained from England, but time and money will be saved by ordering the Steam Tug and Floating Crane of the Dock Company. The Block and Hopper Barges (14 Barges should, the latter be decided on) can be made locally either by English or Chinese contractors. As regards the Floating Crane and steam Tug, I cannot too strongly urge that I may be authorised to enter into a contract with the Dock company without further delay, as recommended in my letter of 25th ultimus. I am deeply impressed with the importance of pressing on the Works. The importance of delay of a single month means a loss to the Government and the Lotholders combined of $50,000 (assuming my former calculations which are based on official estimates to be correct), an amount considerably exceeding the total cost of the Tug and Crane. In my report of 9th January...
Baseline (Original)
Praya works as rapidly as possible, and with this view I propose to lay a line of rails along the quay, between the Blocks and the cofling, on which is to travel a movable steam crave at described in the requisition forwarded to you 3rd instant for transmission to Agents . I now the Crown Ay propose in the first place on place to commence with one Hosting ultimately Grane for setting Blocks in the wall, but it may be found advantageous with a view of carrying on operations at a maximum. speed to order a second Floating chane or - Derrick. The land crane must be obtained from England- but time and money will be saved by ordering the Steam Tug and Floating of the Dock Trane Company. The Block and Hopper Barges 14 Barges (should, the latter be decided on) can be made locally either by English Chinese contractors. As regards the Floating Grave and steam Jug, I cannot too strongly urge that I may be authorised to enter into a contract with the Dock company without further delay, as recommended in my letter of 2 of 25 td ultimus . I am deeply, impressed with the importance of pressing Works. The on the Bay importance of delay of a single mouth means a loss to the Government and the Lotholders combined of $50,000 (assuming my former exlculations which are based on official estimates to be correct) an amount considerably exceeding the total cost of the Jug. In my report of 9th 8. Crane and January
2026-05-26 08:54:10 · Baseline
View content

Praya works as

rapidly as possible,

and with this view I propose to lay a line of rails along the quay, between the Blocks and the cofling, on which is to travel

a movable steam crave at described in the requisition forwarded to you 3rd instant for transmission to

Agents . I now

the Crown Ay propose in the first place

on

place to

commence with one

Hosting

ultimately

Grane for setting Blocks in the wall, but it may be found advantageous with a view of carrying on operations

at a maximum.

speed

to order a second Floating chane or - Derrick. The land crane must be obtained from England- but time and money will be saved by ordering the Steam Tug and Floating

of the Dock

Trane

Company. The Block and Hopper

Barges

14

Barges (should, the latter be decided on) can be made locally either by English Chinese contractors. As regards the Floating Grave and steam Jug, I cannot too strongly urge that I may be authorised to enter into a contract with the Dock company without further delay, as recommended in my letter of 2

of 25 td ultimus . I am deeply, impressed with the importance of pressing

Works. The on the Bay importance of delay of a single mouth means a loss to the Government and the Lotholders combined of $50,000 (assuming my former

exlculations which are based on official

estimates to be correct) an amount considerably exceeding the total cost of the

Jug. In my report of 9th

8.

Crane and

January

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.